Entrance gates in Longford
A complete turnkey automated entrance in Longford runs €6,500 to €9,500 standard, rising to €9,500 to €14,000 for wide cut-stone piers, splayed wing walls and underground motors. Hanging manual gates inside sound existing piers starts at €2,200 to €4,200.
Full front-of-property entrance builds from Longford town and Edgeworthstown to rural Longford: stone or block piers, splayed wing walls, road setbacks and Longford County Council visibility rules.
Free, no obligation. One local installer prices it, not five.
- €2,200–€4,200manual leaves into ready piers
- €6,500–€9,500standard turnkey electric entrance
- 4.5–6 mrural gate setback off road
- 57%of Longford homes outside census towns

Frontage layouts and housing across Longford
Longford counts 16,206 occupied homes in Census 2022. Houses make up 94% of that total, and approximately 57% lie outside the towns. That high rural share defines how entrances are built here. Instead of a narrow town garden, a typical Longford opening is a recessed 3.5 m to 4.8 m avenue frontage set 4.5 m to 6 m back off the road, framed by masonry piers and low splayed wing walls. Housing stock is notably young: 39% dates from 2001 onward versus 32% nationally. On newer estates in Longford town, always check the original grant for open-plan front-garden conditions before building piers or wing walls. Permanent frontage builds cluster where ownership is highest: Drumlish stands at 52% owner-occupied versus 35% in Ballymahon.
Longford town
- Homes (2022)
- 4,037
- Owner-occupied
- 38%
- Built since 2001
- 40%
- Typical entrance brief
- Standard town openings alongside country approach roads; pier core soundness sets the budget.
Edgeworthstown
- Homes (2022)
- 744
- Owner-occupied
- 37%
- Built since 2001
- 60%
- Typical entrance brief
- Younger suburban streets where matching house RAL tones and keeping front walls under 1.2 m matter most.
Ballymahon
- Homes (2022)
- 645
- Owner-occupied
- 35%
- Built since 2001
- 49%
- Typical entrance brief
- Recent housing stock; verify underground utility routes across the front garden before excavating strip footings.
Granard
- Homes (2022)
- 416
- Owner-occupied
- 38%
- Built since 2001
- 35%
- Typical entrance brief
- Traditional stone and brick street edges where bespoke wrought-iron style leaves fit without widening the gap.
Drumlish
- Homes (2022)
- 409
- Owner-occupied
- 52%
- Built since 2001
- 70%
- Typical entrance brief
- Predominantly post-2001 housing; check estate open-plan covenants before ordering front masonry piers.
Price my entrance
Four quick taps and our Irish price guide shows before we ask for a phone number. One local installer rings you, not five.
A country stone-pier entrance, 3.5 m to 4.8 m with new piers and wing walls, electric motors and remotes, in Longford: €8,000 to €17,200, supplied and fitted.
How the entrance guide is calculated
Figures reflect going Irish supply-and-fit rates for residential and site entrance packages. Ready-pier totals include custom gate leaves, heavy hanging ironwork and installation. New-pier and wing-wall options add excavation, reinforced strip footings, solid-cored piers and capping, with stone cladding factored in on stone-pier and wing-wall builds. Electric and full-intercom tiers add motors, IS EN 12453 safety photocells, remotes, intercom column hardware and pillar lighting allowances. Long armoured cable runs and tarmac reinstatement vary by site and are confirmed in writing after a site survey.
Stone, block piers and ground conditions in Longford
Pier specification follows both local stone character and subsoil. Wide country entrances around Ballymahon and Edgeworthstown use rendered block piers or prefabricated craned stone pillars set on deep footings clear of soft peat edges. Across the county, the ground is low-lying land with raised bog in the south and west towards Lanesborough and the Shannon, and drumlin clay in the north around Granard.
Rendered solid block piers (pair)
€800 to €1,500
Allow €300 to €800 for strip footing excavation where piers are priced separately from full packages.
Stone-clad or brick piers (pair)
€1,500 to €3,000
Leave final gate measurement until stone facing or plaster is complete, as cladding narrows the opening by 50 mm to 100 mm.
Splayed wing walls (block / stone)
€100 to €180 to €250 / m
Rendered block walls run €100 to €180/m and stone-clad walls €150 to €250/m, built 1.0 m to 1.2 m high.
Peat pockets and cutaway bog
- Piers, footings and leaves
- Never sit masonry piers on peat. Excavate down to firm boulder clay or gravel and tie both piers across the threshold with one reinforced concrete beam.
- Motors, ducts and access
- Bed triple 50 mm ducts on clean stone with slack at pier entries, and favour above-ground rams (€1,200 to €2,500) over sunken boxes.
Heavy, slow-draining clay
- Piers, footings and leaves
- Excavate continuous strip footings 700 mm to 800 mm deep below seasonal shrink-swell clay and pour concrete the same day so trench walls stay clean.
- Motors, ducts and access
- Use IP66 rotary isolators and separate circuits for pier lights so damp lanterns never trip the gate automation board.
Open level plains with long wind fetch
- Piers, footings and leaves
- Flat open country gives winter gusts an uninterrupted run against closed gates; continuous strip footings stop wide piers creeping inward over time.
- Motors, ducts and access
- Long straight rural avenues over 40 m need heavier-gauge 4 mm² or 6 mm² SWA cable to hold steady motor voltage.
Factor in exposure alongside the masonry: Longford is flat and inland, open across the bogs and along Lough Ree. Compare country stone-pier entrances, splayed wing-wall entrances and matching boundary walls and gates when setting pier widths.
Three Longford entrance builds priced
Stone-pier rural entrance near Longford town
€8,000 to €17,200
Covers footings, stone-clad piers, custom leaves and electric drive for a rural Longford town opening. Long SWA cable trenches (€500 to €2,000) are confirmed on survey.
Rendered piers and 8 m wing walls near Edgeworthstown
€1,600 to €2,940
Full splayed block bellmouth masonry ready for render and gates: 8 m of front wall under 1.2 m plus two reinforced piers.
Automation + 4G GSM column near Ballymahon
€3,350 to €6,000
Retrofit motors and safety beams (€2,400 to €3,800) paired with a 4G GSM video intercom and steel pedestal (€950 to €2,200) on sound existing gates.
Our guide is national across Ireland, Longford included. Quotes here shift with pier masonry choice (block at €800 to €1,500 versus cut stone at €2,500 to €7,500), cable distance from the consumer unit, and 4G GSM column additions (€950 to €2,200). Sequence civils early: pier masonry and curing take 2 to 3 weeks and bespoke gate fabrication 4 to 6 weeks, putting turnkey openings at 6 to 10 weeks (project timelines). Always check whether your written quote sits at 13.5% or 23% VAT under Revenue two-thirds rules, and review every line item on entrance gate costs.
Road setbacks, sightlines and Longford County Council
Longford County Council is the planning authority for Longford, working from Longford town.
Class 5 caps exempt replacement gates at 2 m and solid front walls forward of the house at 1.2 m, but Article 9 removes that exemption immediately if piers block road visibility or if an opening onto a public road is created or widened: read planning and road access rules.
For rural road frontages, county standards and TII guidance set domestic gates 4.5 m to 6 m back from the carriageway edge (10 m to 15 m for farm or commercial yards) and measure visibility splays from 2.4 m back: 70 m at 50 km/h, 90 m on 60 km/h rural L-roads since 7 February 2025, 160 m on 80 km/h R-roads and 215 m at 100 km/h (road setbacks and sightlines). Flat straight approaches off the N4, N5 and bog-edge L-roads often carry fast traffic, making a full 5.5 m to 6.0 m setback essential on automated entrances. An €80 Section 5 declaration puts the council's view on paper inside 4 weeks, protecting future property sales.
- Estate open-plan grants in Longford town and Edgeworthstown. Newer residential estates frequently carry a planning condition removing Class 5 exemptions for front walls and piers; check the folio or original grant before starting.
- Bellmouth drainage off rural roads. Planning grants on Longford country openings routinely require a linear slot drain across the recessed apron tied to an on-site soakaway so surface water never discharges onto the carriageway.
- National road restrictions (the N4 and N5). Outside 50 km/h urban speed zones, TII spatial guidelines strictly oppose new direct domestic accesses onto N-roads and converting field gates into house entrances.
Longford towns covered and counties beside it
From Longford town, Edgeworthstown, Ballymahon, Granard, Drumlish and Newtownforbes to one-off houses and small farms, many on or beside cutaway bog, one local installer handles the survey and written quotation so masonry piers, triple ducts and gate leaves stay coordinated under one roof.
- Entrance gates in Leitrim. Heavily rural splayed entrances, concrete-cored piers on wet clay and hedgerow splay geometry.
- Entrance gates in Cavan. Stepped drumlin entrances, deep-cored block piers and above-ground automation clear of wet clay.
- Entrance gates in Westmeath. Lakeshore stone-pier avenues, gravel footings and wide splayed entrances off the N4 and N52.
- Entrance gates in Roscommon. Limestone-pier one-off frontages on thin karst soil with wide plain sightlines.
Related guides: boundary walls, railings and entrance gates, vehicle and pedestrian combos and 4G GSM intercom columns. Full nationwide coverage sits on counties covered.
Leinster: Carlow · Dublin · Kildare · Kilkenny · Laois · Louth · Meath · Offaly · Westmeath · Wexford · Wicklow
Munster: Clare · Cork · Kerry · Limerick · Tipperary · Waterford
Connacht: Galway · Leitrim · Mayo · Roscommon · Sligo
Ulster: Cavan · Donegal · Monaghan
Before breaking ground on a Longford entrance
What do entrance gates with piers cost in Longford?
Expect €6,500 to €9,500 for a mid-range turnkey automated entrance with block or stone-clad piers, motors, photocells and keypad. Where piers are already plumb and solid, manual leaves cost €2,200 to €4,200. Example: Stone-pier rural entrance near Longford town (€8,000 to €17,200).
How far back from the road must rural entrance gates sit in Longford?
Like-for-like gates up to 2 m high inside an existing lawful opening are normally exempt under Class 5, with solid front walls capped at 1.2 m. Creating or widening a road entrance goes to Longford County Council, which checks 4.5 m to 6 m domestic setbacks and visibility splays (90 m on 60 km/h L-roads since 7 February 2025, 160 m on 80 km/h R-roads).
Can new entrance gates hang on my existing Longford piers?
Concrete-cored rendered block piers run €800 to €1,500 a pair, brick or stone-clad piers €1,500 to €3,000, prefabricated craned stone piers €2,000 to €4,500, and solid cut stone €2,500 to €7,500. Front wing walls run €100 to €180/m rendered or €150 to €250/m stone-clad.
What automation suits wide stone piers in Longford?
On sound existing gates, retrofit automation runs €2,400 to €3,800. Choose underground boxes (€2,000 to €3,500) only where ground drains freely; otherwise surface rams or articulated arms (€1,200 to €2,500) avoid winter flood damage and simplify yearly servicing.
What ducts and cabling go in before tarmac on a Longford entrance?
Lay three separate 50 mm twin-wall ducts 600 mm deep before paving or tarmac: mains SWA power, cross-drive motor/photocell cables and shielded comms. Trenching and SWA cabling runs €500 to €2,000, with fuse-board termination certified by a Safe Electric Registered Electrical Contractor.
Every entrance guide on this site
Entrance packages
Civils, specs & rules

Price your stone-pier entrance package
Choose whether piers are already standing or being built new, and get one local entrance installer to inspect your rural frontage.
